Sample Dispatch, Receipt & Allocation
S.E Store dispatch → Lab Receiver acknowledgement → Lab Allocator → Testing Engineer.
Send selected samples to Hi-Tech Lab
| Sample / Equipment | Store / Dispatch | Quantity | Status | Acknowledgement | Allocation | Actions |
|---|
Mandatory Password Change
Create a password of at least 12 characters containing uppercase, lowercase, number and symbol.
Laboratory Operations Dashboard
Electrical equipment testing, independent review and controlled release.
Download sample test reportControlled workflow
Electronic approvals require password re-authentication. Approved reports receive a controlled number and cannot be edited.
Testing Workspace
Reports & Approval
| Report No. | Sample / Equipment | Test / Value | Testing | Review | Approval | Status | Action |
|---|
Calibration & Instrument Master
| Code | Instrument | Make/Model | Serial | Range | Due | Certificate | Status | Stage / Actions |
|---|
Complete Audit Trail
| Time | User | Action | Entity | IP | Event Hash |
|---|
User Login & Role Permissions
Create User
Employee ID, phone number and email ID are mandatory for every new user. Only one active user is allowed per role. Block the current role holder before creating a replacement. To change a user’s role: Block → select role → Save Role → Unblock.
| Username | Full name | Role | Employee ID / Phone | Active | Password change | Reset password |
|---|
Backup & Restoration
Backups are compressed, server-side logical snapshots covering users, results, signatures, audit records, report sequences and instruments.
| Backup | Size | Created | Restore |
|---|
Controlled Testing Booklets
Distribution Transformer
Open bookletXLPE Cable
Open bookletCT / VT / Isolator / Surge Arrester
Open bookletTransformer HV Withstand Procedure
Controlled procedure guide — qualified laboratory personnel only. Select separate-source applied voltage or induced voltage as specified in the approved test plan. This guide addresses separate-source testing; induced voltage requires its own frequency and duration procedure.
- Confirm transformer identity, rating, insulation level, test winding, applicable controlled standard edition and approved voltage/duration. Do not infer test voltage from nominal voltage alone.
- Verify valid calibration, test-set capacity, protective earthing, interlocks, barriers, emergency trip, permits and personnel clearance. Isolate the transformer from all external circuits.
- Follow the approved connection drawing: join the terminals of the winding under test as required; earth the remaining windings, tank and core according to the approved procedure. Record the drawing reference.
- After authorised clearance, raise the voltage using the approved ramp; maintain the specified voltage for the specified duration. Record applied voltage, duration and observed breakdown/flashover or trip.
- Reduce voltage to zero, isolate the supply, discharge and earth the test object. Confirm safe access before changing connections.
- Repeat required winding configurations. Retain observations, instrument/certificate references and deviations. Failure or unexplained trip requires engineering review.
Use the transformer booklet and a controlled copy of the applicable IS 2026 dielectric-test requirements / IS 1180 specification as applicable. Switchgear: applicable IS/IEC 62271 parts. Confirm editions, amendments and contractual requirements with the standards custodian.
For HV evaluation enter minimum applied voltage, minimum duration and a maximum breakdown-event count of zero, each with the approved criterion reference. Automatic comparison does not verify connections or test completeness.
Download illustrative sample report (HTML; print to PDF)Standards register
Security & Data Integrity
Role-based access
Admin, M.D and D.T view-only access; Testing Engineer entry; E.E review; S.E approval.
Electronic signature
Signer identity, timestamp, intent, record hash and signature hash are retained.
Audit chain
Every security and data event is HMAC hash-chained for tamper detection.
Record protection
Only drafts can change. Approved and rejected records are permanently locked.
Session security
30-minute timeout, HttpOnly/SameSite cookies, CSRF protection and account lockout.
Report control
Approval issues sequential DVVNL/HTL/YYYY/NNNNN numbers.